| Project: |
Development & Maintenance of Student Hostel Blocks on Build, Operate and Transfer (BOT) Basis |
| Site Area: |
Suitable area to be allocated within PDPU Campus |
Number of Hostel Blocks: |
5 (Five) |
| Block Details: |
Each block having 14 No. of rooms X 4 Floors = 56 Rooms ( Ready to move in – including furniture) |
| Student Rooms: |
5 blocks X 56 Rooms = 280 Rooms (Twin sharing Rooms) |
Break –up of Built-up-Area: |
5 Hostel Blocks including block to block connecting passage (G+3) |
12,250 Sqm. |
Amenities Building (single floor) |
- sqm.
|
Total Built Up Area |
12,461 sqm. |
|
Carpet area of typical student room (Without Toilet):18.10 Sqm. |
| Construction Period: |
11 months |
Operation and Maintenance Period: |
12 years (excluding Construction Period) |
Capital Grant from PDPU: |
Rs.5 crore |
| Consideration: |
The Developer shall get Half Yearly Annuity Payment payable by PDPU, escalated periodically for 12 years. |
| Escalation: |
The Half Yearly Annuity Payment shall be subject to escalation @ 10% after completion of every 3 (three) years of Operation & Maintenance period |
Eligibility Criteria:
Technical Criteria: |
The Bidder should have completed (either Construction or Development) a Similar Project meeting following parameter
- at least 15,000 sq.m., Commercial/ Residential built up space in the last 5 years, in a Single Project; or
- at least totalling 20,000 sq.m., Commercial/ Residential built up space in the last 5 years, through a maximum of 3 Projects, with minimum 5,000 sq.m. built-up space for each project
|
| Financial Criteria: |
The Bidder should have Minimum Net-worth of, as on the 31st March 2011, Rs.10,00,00,000/- (Rupees Ten Crore Only) |
Contact Persons |
Mr. Chandranath Dey,
Phone: +91-90999 71598
e-mail: chandranath.dey@ap.jll.com |
| |
Mr. Varun Sharma,
Phone: +91-90999 71599
e-mail: varun.sharma@ap.jll.com |
Important Dates under consideration: |
Activity |
Dates |
RfP documents downloadable from http://www.pdpu.ac.in |
17th October, 2011 |
Last date of sending queries on RfP |
3rd Nov, 2011 |
Site Visit & Pre – Bid Meeting |
4th Nov, 2011 |
Last date of Submission of Technical & Financial Bids |
14th Nov, 2011 |
Opening of Technical Bid |
14th Nov, 2011 |
Opening of Financial Bid |
To be announced |
|
Note: Any change in dates should be at the sole discretion of PDPU. |
All interested parties are requested to download the Request for Proposal (RfP) after filling the following details; |
|
Note: PDPU requests all interested parties to fill in correct contact information for ease in correspondence. |
| Submit Above form & Download Documents |